social housing
2 storey quick-room
The ground is prepared and trench dug foundations are poured
Sub walls built,and sub floor poured
Two lorries arrive with ground floor and first floor sip units
The roof is the last piece to be constructed, where it is made water tight and the appropriate roof membranes and materials are fitted
The houses can be formed as detached, semi detached or as terraces, with variations in the roof design and creating an interesting roofscape.
It takes approximately 4 weeks from prepared sub floor to hand over.
The houses are of code 4 rating for the code for sustainable homes, and designed to comply with NIHE.
![]()